Gibbs Marine 2008 Hauling, Storage & Winterizing Contract
118 Petten Street Office (585) 663-8990 NON-Trailered Boats
Rochester, NY 14612 Fax (585) 227-6442 Email: Service@GibbsMarineGroup.com
1. Move boat from slip to haul out (for waste pump out, add $1.00/Ft) $1.00 or $2.00/Ft x ______ = ___________
2. Haul (includes hull pressure wash) & Re-Launch vessel $12.00/Ft x ______ = ___________
3. Winter Land Storage (if 2009 dockage is paid by 10/31/08 write FREE) $15.00/Ft x ______ = ___________
4. Upgrade to Indoor Storage (items 2 & 3 are needed in addition) $25.00/Ft x ______ = ___________
5. Winterize Engine ($100 if carbureted, $125 if fuel injected) $100.00 or $125.00 x ___ engine(s) = ___________
6. Cold Water System Winterization $50.00 = ___________7. Hot Water System Winterization $50.00 = ___________
8. Air Conditioning unit or Generator unit Winterization (Please Circle) $40.00 x ___ unit(s) = ___________
9. Engine Oil and Filter Change (Premium Marine oil and filter) $85.00 x ___ engine(s) = ___________
10. Sterndrive Oil Change $60.00 x ___ Sterndrive(s) = ___________
11. Service Sterndrive (see description on reverse) $110.00 x ___ Sterndrive(s) = ___________
12. Blocking or cradle rental for season (needed unless you provide it) $4.00/Ft X ______ = ___________
13. Shrink Wrap Vessel [cost is L x (W+2)] Overall length _____ X (width _____ of boat + 2 ) = ___________
14. Acid Wash hull (if not painted with antifouling paint) $7.00/ft X overall length _____ ft = ___________
15. Un-step Sail boat mast., Re-step mast in Spring (cost based on boat length) $10.00/Ft X ______ = ___________
|
Gibbs Marine 2008 Hauling, Storage & Winterizing Contract
118 Petten Street Office (585) 663-8990 Trailered Boats
Rochester, NY 14612 Fax (585) 227-6442 Email: Service@GibbsMarineGroup.com
1. Move boat from slip to haul out (for waste pump out, add $1.00/Ft) $1.00 or $2.00/Ft x ______ = ___________
2. Haul out with lift onto trailer, Pressure wash hull, Re-launch boat in Spring $10.00/Ft X ______ = ___________
3. Winter Land Storage (if 2009 dockage is paid by 10/31/08 write FREE) $15.00/Ft x ______ = ___________
4. Upgrade to Indoor Storage (item 3 is needed in addition) $25.00/Ft x ______ = ___________
5. Winterize Engine ($100 if carbureted, $125 if fuel injected) $100.00 or $125.00 x ___ engine(s) = ___________
6. Cold Water System Winterization $50.00 = ___________
7. Hot Water System Winterization $50.00 = ___________
8. Air Conditioning unit or Generator unit Winterization (please circle) $40.00 x ___ unit(s) = ___________
9. Engine Oil and Filter Change (Premium Marine oil and filter) $85.00 x ___ engine(s) = ___________
10. Sterndrive Oil Change $60.00 x ___ Sterndrive(s) = ___________
11. Service Sterndrive (see description on reverse) $110.00 x ___ Sterndrive(s) = ___________
12. Shrink Wrap Vessel [cost is L x (W+2)] Overall length _____ X (width _____ of boat + 2 ) = ___________
13. Acid Wash hull (if not painted with antifouling paint) $7.00/ft X overall length _____ ft = ___________
14. Un-step Sail boat mast, Re-Step mast in Spring (cost based on boat length) $10.00/Ft X ______ = ___________ |